Day one- we built the platform for the tree house and incorporated this old stump into the structure. |
Day two- we built the adjacent structure and put in the decking. |
Day three- we added the slide and the 10 foot high swing beam. |
Day four- we put in most of the railings. These railings are made from the branches of the same tree that contributed its stump on the first day. |
Day five- we finished the railings and put in the swing hangers. We decided our ten foot high swing beam will probably call for some extension chains. |
Day six- we finish |
We built the drawbridge- operated by winch. We properly installed the swings including the board swing we built. We built the sandbox and hung the hammock. |
Ready for play |
Swinging in the hammock |
Inspecting the bridge |
Surfing the board swing |
Here is a close up of the deck and rails. |
And this is how the rails look from the outside. |
Later I added some animal designs on various spots of the play structure. This lion pops up when the drawbridge goes up. |
There was some extra dowel, so we made these chessmen and imprinted a board on the floor of the tree house. |
2 comments:
Looks amazing! Great job!
That is sooooo awesome!!!! What a dream for a kid!! Great work!
Post a Comment